12-7-02 Of course, we get started by roughing in the new walls, ceiling and stairway. Viewed: 41 times.
|
| 12-7-02 Here's a look at some of the plumbing installed for the bathroom(on the left) and for the bar(straight ahead-right). Viewed: 52 times.
|
| 12-7-02 Let's wall off the utility room and prep for the drop ceiling. Viewed: 37 times.
|
|
| | |
| | |
|
|
|
|
12-10-02 Next, we get the drywall put up and cutout the electrical outlets. Viewed: 50 times.
|
| 12-9-02 A look at where the wet bar is going in. Viewed: 49 times.
|
| 12-13-02 The drywall mudding is looking good. Viewed: 42 times.
|
|
| | |
| | |
|
|
|
|
12-13-02 Looks like Rich is asking Gary to tidy up the wall outlets after the mudding was completed. Viewed: 64 times.
|
| 12-13-02 The drywall appears sanded and ready to move on. Chris came up with a good idea to put storage under the stairs. Viewed: 60 times.
|
| 12-10-02 Some French doors are going to look nice going into that 'office' room there. Viewed: 52 times.
|
|
| | |