| | |
|
|
|
|
The pad for the pole barn is level and ready for post holes to be dug. Viewed: 497 times.
|
| Rich begins drilling the post holes. Viewed: 424 times.
|
| Despite a few large rocks, the holes turned out well. Viewed: 547 times.
|
|
| | |
| | |
|
|
|
|
The poles are all in place and are being supported to hold them in their precise position. Viewed: 514 times.
|
| The pole barn is starting to take shape. Viewed: 600 times.
|
| The first floor framing is nearly complete.* Viewed: 535 times.
|
|
| | |
| | |
|
|
|
|
View showing where the rear windows are going to be placed. Viewed: 471 times.
|
| The final shape of the pole barn is starting to take place. Viewed: 724 times.
|
| With the second floor nearly complete you can see how the gambrel roof is going to look. Viewed: 772 times.
|
|
| | |